Expressway from HCMC to Can Tho is a part of North-South expressway axis. Prior - Viability researching report was approved by Minister in May, 2015.
This route always serves one of the greatest amount of traffic all over Vietnam.
The expressway has been currently building 40km completely from HCMC to Trung Luong.
Finishing expressway from HCMC to Can Tho, investment in the rest on Trung Luong-My Thuan route and My Thuan-Can Tho route, in particular, contribute to forming the route network in developing and completing nationwide route network program.
Follow Minister’s leading words on deploying BOT projects on transportations, BIDV Vietnam has been delegated to establish expressway Trung Luong – My Thuan - Can Tho investment company as a BOT company.
BIDV Expressway Development Joint Stock (BEDC) was founded to invest and construct Expressway from Trung Luong to Can Tho.
On the basis of suggesting project passed by Ministry of Transports (Document 343/QĐ-BGTVT on Feb 4th, 2008), Transportation TVTK Company carried out Expressway Trung Luong – My Thuan - Can Tho project.
The project was assessed by Ministry of Transports (Document 7910/BGTVT-KHĐT on Oct 28th , 2008) and was approved by BEDC Board of Directors (Document 007/QĐ-HĐQT on March, 26th, 2009).
The projects has complied with route directions, cross-section scale, scale and location of bridges and intersections in project plan as well as in assessment report by Ministry of Transports.
On the basis of suggestions by BEDC, Minister has approved the separating project into projects with different investors and different forms of investment:
- Trung Luong – My Thuan Expressway in form of BOT, the investor is BEDC. The project started on November 29th, 2009 and BEDC approved to adjust the project with Document 021/QĐ-HĐQT on January 11th, 2010.
- My Thuan - Can Tho Expressway, the investor is My Thuan Project Management (now is Cuu Long CIPM). Project was approved by Ministry of Transports at Document 650/QĐ-BGTVT on April 4th, 2011
TT | Standards | Code |
1 | Expressway requiring design | TCVN 5729-97 |
2 | Direction Sign on Expressway | 22TCN 331-05 |
3 | Standards of bridge design | 22TCN 272-05 |
4 | Traffic Construction in Earthquake area – | 22 TCN 211-95 |
5 | Pile foundation - Standards of design | 20TCN 21-86 |
6 | Pre-stressed concrete hook T13, T15 & D13, D15 | 22TCN 267-2000 |
7 | Bridge rubber plate bearing | AASHTO M251-96 |
8 | Technical survey for pile foundation design and construction | 20TCN 160-87 |
9 | Geological Survey Drilling Process | 22 TCN 259-2000 |
10 | Standard of elastic gap | AASHTO M297-96 AASHTO M183-96 |
11 | Calculation on typical flow of flood | 22 TCN 260-2000 |
12 | Technical classification of domestic river route | TCVN 5664-92 |
13 | Geological Survey Process of waterway construction | 22 TCN 260-2000 |
14 | Design Survey Process of highway foundation the weak ground | 22 TCN 262-2000 |
15 | Highway Examining Process | 22 TCN 263-2000 |
16 | Highway – Require standard design (for side roads, frontage road, linking road to expressway) | TCVN 4054 -05 |
17 | Design process of hard road cover. | 22 TCN 223-95 |
18 | Design process of soft road cover. | 22 TCN 211-06 |
19 | Road signal regulation | 22 TCN 237- 01 |
20 | Design process of bridges and drains in limited situation (applied for drain design) | 22 TCN 18-79** |
21 | Geological Survey and stabilizing method design Process of road foundation with slide act and collapse | 22 TCN 171-87 |
22 | Assessing process on environment effects on project and design | 22 TCN 242-98 |
23 | Urban routes – require design | TCXDVN 104-2007 |
24 | Standard of road design (intersection) | 22 TCN 273-01 |
25 | Design standards on human-made lighting on road, street, urban square. | TCXDVN 259:2001 TCXDVN 333:2005 |
26 | Technical requirement and experiment method on POLIME concrete. | 22 TCN 319-04 |
27 | CPT and CPTU | 22 TCN 320-2004 |
28 | Design Standard (for side roads, frontage road ) | 22 TCN 210-92 |
29 | Topographic regulation | 96 TCN 43-90 |
30 | Design and Handling Design Process on weak ground with absorbing rush | 22 TCN 244-98 |
31 | Technical-geo cloth in foundation building on weak ground | 22 TCN 248-98 |
32 | Geodetic task in construction – general requirement | TCVN 309-2004 |
33 | Standard of solid road concrete – technical requirement and experiment methods | 22 TCN 279-01 |
34 | Pile drill – design, construct, acceptance | 22 TCN 257 - 2000 |
35 | Design standard of tuynen | 11 TCN 19-84 |
36 | Iron Structure – design standard | TCXDVN 338-2005 |
37 | Design of drainage system outside of work | 22 TCN 51-84 |