CII E&C is the company in charge of packages of main road and parallel lines. Details following:
- Building & Installing Package BS1: Build civil roads and barriers (route on the left from Quoc Huong street to Giang Van Minh street, District 2) (completed).
- Package XL1: Build drainage system of partial investment work of Hanoi Highway (completed).
- Package XL2: Build routes of partial investment work of Hanoi Highway (completed).
- Package XL6B: Build routes and drainage system of main road (from the old toll to Southern Cai Lai intersection) (completed).
- Package XL6F: Build the part of main road at Cat Lai intersection (completed).
- Package XL1: Build routes and drainage system of main road (from Tay Hoa cross-road to Binh Thai intersection) (completed).
- Package XL2: Build drainage system of main road (from Binh Thai cross-road to Thu Duc cross-road) (completed).
- Package XL7: Build routes and drainage system of main road, from Thu Duc intersection to Suoi Cai bridge (completed).
- Package XL8: Build routes and drainage system of main road from Suoi Cai bridge to Tram 2 intersection (completed).
- Package XL8A: Build routes and drainage system of main road, from the end of Tram 2 intersection to the beginning of intersection at Vietnam National University (completed).
- Package SHT-2A: Build parallel lines on the left (from Sai Gon bridge to Rach Chiec bridge) (in progress).
- Package SHT-6A: Build parallel lines on the left (from Rach Chiec bridge to Thu Duc cross-road intersection) (in progress).
- Package SHT-8A: Build parallel lines on the left (from Thu Duc cross-road intersection to Suoi Cai bridge) (in progress).
- Package SHT-10A: Build parallel lines on the left (from Suoi Cai bridge to intersection at Vietnam National University) (in progress).
- Package SHP-3A: Build parallel lines on the right (from Rach Chiec bridge to People’s Committee of District 9) (in progress).
- Package SHP-5A: Build parallel lines on the right (from People’s Committee of District 9 to the end of Thu Duc cross-road intersection ) (in progress).
- Package SHP-7A: Build parallel lines on the right (from the end of Thu Duc cross-road intersection to intersection at Vietnam National University) (in progress).
- Package SHP-3C: Build parallel lines on the left (from Suoi Cai bridge to intersection at Vietnam National University) (in progress).
- Package BS2: Build Suoi Cai bridge and reform corresponding ditch (in progress).
Package Information: PACKAGE SHT-2A: BUILD PARALLEL LINES ON THE LEFT (FROM SAI GON BRIDGE TO RACH CHIEC BRIDGE) * Project: Hanoi Highway Expanding Project. * General information: Building and installing package SHT-2A: Build parallel lines on the left (from Sai Gon bridge to Rach Chiec bridge) included in Hanoi Highway Expanding Project, main jobs following:
- Building surface of roads;
- Building pavement;
- Building vertical rain drainage system;
- Building flyover of water pipes.
* Duration: 18 months. * Contract Value: 140 Billion VND
* Location:District 2 – Ho Chi Minh City. PACKAGE SHT-6A:BUILD PARALLEL LINES ON THE LEFT (FROM BRIDGE RACH CHIEC TO THU DUC CROSS-ROAD INTERSECTION ) * Project: Hanoi Highway Expanding Project. * General information: Building and installing package SHT-6A: Build parallel lines on the left (from Rach Chiec bridge to Thu Duc cross-road intersection ) included in Hanoi Highway Expanding Project, main jobs following:
- Building surface of roads;
- Building pavement;
- Building vertical rain drainage system;
- Building flyover of water pipes.
* Duration: 18 months. * Contract Value: 159,7 Billion VND
* Location: Thu Duc District – Ho Chi Minh City. BUILDING AND INSTALLING PACKAGE SHT-8A : BUILD PARALLEL LINES ON THE LEFT (FROM THU DUC CROSS-ROAD TO SUOI CAI BRIDGE) * Project: Hanoi Highway Expanding Project. * General information: Building and installing package SHT-8A: Build parallel lines on the left (from Thu Duc cross-road intersection to Suoi Cai bridge) included in Hanoi Highway Expanding Project, main jobs following:
- Building surface of roads;
- Building pavement;
- Building vertical rain drainage system;
* Duration: 12 months. * Contract Value: 64,2 Billion VND
* Location: Thu Duc District – Ho Chi Minh City. BUILDING AND INSTALLING PACKAGE SHT-10A : BUILD PARALLEL LINES ON THE LEFT (FROM SUOI CAI BRIDGE TO INTERSECTION AT VNU) * Project: Hanoi Highway Expanding Project. * General information: Building and installing package SHT-10A: Build parallel lines on the left (from Suoi Cai bridge to intersection at VNU) included in Hanoi Highway Expanding Project, main jobs following:
- Building surface of roads;
- Building pavement;
- Building vertical rain drainage system;
* Duration: 12 months. * Contract Value: 46,6 Billion VND
* Location: Thu Duc District – Ho Chi Minh City.
BUILDING AND INSTALLING PACKAGE SHP-3A: BUILD PARALLEL LINES ON THE RIGHT (FROM RACH CHIEC BRIDGE TO PEOPLE’S COMMITTEE OF DISTRICT 9) * Project: Hanoi Highway Expanding Project. * General information: Building and installing package SHP-3A: Build parallel lines on the right (from Rach Chiec bridge to People’s Committee of District 9) included in Hanoi Highway Expanding Project, main jobs following:
- Building surface of roads;
- Building pavement;
- Building vertical rain drainage system;
* Duration: 15 months. * Contract Value: 105, 9 Billion VND
* Location:District 9 – Ho Chi Minh City.
BUILDING AND INSTALLING PACKAGE SHP-5A : BUILD PARALLEL LINES ON THE RIGHT (FROM PEOPLE’S COMMITTEE OF DISTRICT 9 TO THE END OF THU DUC CROSS-ROAD INTERSECTION ) * Project: Hanoi Highway Expanding Project. * General information: Building and installing package SHP-5A: Build parallel lines on the right (from People’s Committee of District 9 to the end of Thu Duc cross-road intersection ) included in Hanoi Highway Expanding Project, main jobs following:
- Building surface of roads;
- Building pavement;
- Building vertical rain drainage system;
* Duration: 11 months. * Contract Value: 50,5 Billion VND
* Location:District 9 – Ho Chi Minh City.
BUILDING AND INSTALLING PACKAGE SHP-7A : BUILD PARALLEL LINES ON THE RIGHT (FROM THE END OF THU DUC CROSS-ROAD INTERSECTION TO INTERSECTION AT VIETNAM NATIONAL UNIVERSITY) * Project: Hanoi Highway Expanding Project. * General information: Building and installing package SHP-7A: Build parallel lines on the right (from the end of Thu Duc cross-road intersection to intersection at VNU) included in Hanoi Highway Expanding Project, main jobs following:
- Building surface of roads;
- Building pavement;
- Building vertical rain drainage system;
* Duration: 14 months. * Contract Value: 107 Billion VND
* Location:District 9 – Ho Chi Minh City.
BUILDING AND INSTALLING PACKAGE SHP-3C : PLANTING AND TITLING PAVEMENT OF THE PARALLEL LINES ON THE RIGHT (FROM RACH CHIEC BRIDGE TO INTERSECTION AT VNU) * Project: Hanoi Highway Expanding Project. * General information: Building and installing package SHP-3C: Planting and titling pavement of the parallel lines on the right (from Rach Chiec bridge to intersection at VNU) included in Hanoi Highway Expanding Project, main jobs following:
- Titling pavement
- Planting * Duration: 15 months. * Contract Value: 15, 3 Billion VND
* Location:District 9 – Ho Chi Minh City.
BUILDING AND INSTALLING PACKAGE 7 : BUILD ROADS AND DRAINAGE SYSTEM OF MAIN ROAD (FROM THU DUC INTERSECTION TO SUOI CAI BRIDGE) * Project: Hanoi Highway Expanding Project. * General information: Building and installing package SHP-7: build roads and drainage system of main road (from thu duc intersection to suoi cai bridge) included in Hanoi Highway Expanding Project, main jobs following:
- Building surface of roads;
- Building vertical rain drainage system; * Duration: … months. * Contract Value: 46,3 Billion VND
* Location:District 9 and Thu Duc District – Ho Chi Minh City. BUILDING AND INSTALLING PACKAGE 8 : BUILD ROADS AND DRAINAGE SYSTEM OF MAIN ROAD (FROM SUOI CAI BRIDGE TO NORTHERN TRAM 2) * Project: Hanoi Highway Expanding Project. * General information: building and installing package 8 : build roads and drainage system of main road (from Suoi Cai bridge to Northern Tram 2) included in Hanoi Highway Expanding Project, main jobs following:
- Building surface of roads;
- Building vertical rain drainage system; * Duration: … months. * Contract Value: 79,9 Billion VND
* Location:District 9 and Thu Duc District – Ho Chi Minh City.
BUILDING AND INSTALLING PACKAGE 8A : BUILD ROADS AND DRAINAGE SYSTEM OF MAIN ROAD (ĐOẠN FROM BẮC TRẠM 2 TO INTERSECTION VIETNAM NATIONAL UNIVERSITY) * Project: Hanoi Highway Expanding Project. * General information: building and installing package 8A : build roads and drainage system of main road (from Northern Tram 2 to intersection at VNU) included in Hanoi Highway Expanding Project, main jobs following:
- Building surface of roads;
- Building vertical rain drainage system;
- Installing horizontal box drain (2.5x2.5)m prolonged at Km11 + 718.50 * Duration: 6 months.
* Location:District 9 and Thu Duc District – Ho Chi Minh City.