Detail: SAI Gon 2 bridge Project
Total investment: 1.495 billion VND
Construction period: 18 months (3 months ahead of schedule)
Basic information: As approved project, Sai Gon 2 bridge located toward lower reach ( on the right side of the direction from Binh Thanh district to district 2) of the current Sai Gon, starting point connected with Dien Bien Phu street, Ending point connected with BOT project of widening Ha Noi highway, Sai Gon 2 bridge was constructed by reinforced concrete and pre-stressed concrete
Lifetime: 100 years
Total length of bridge: 987.32m, 30 bridge spans,
Bridge width: 23.5m
Gravity load: live load HL-93
Pedestrian: 3x10-3 Mpa
Shock load: self-propelled ship 1000DWT, tugging barge 500DWT
Earthquake load: level 7 ( MSK-64 scale)
Navigational clearance: B x H = 80 m x 9m
Height clearance of under-grade crossing: H = 4,50m and H=4,75m
The length of approach embankment of Binh Thanh District: 250m, of district 2: 117m
Bridge level: Main urban road, level 1
Technique level: level 80
Design velocity: 80km/h
Relieving floor for bridge head and bridge end: succeed after 2 abutments
Relieving floor was made of reinforcement on reinforce cement pile bottom
Importance of project
Sai Gon 2 Bridge was one out of five major construction projects of HCMC in 2013. CII was one out of three joint ventures of this project. Awarded of responsibility and great pleasure of being assigned for Sai Gon 2 construction Project, CII had made a great effort to accelerate the progress as soon as starting the project.
As an efficient and experienced company in traffic infrastructure construction field, we guaranteed the efficiency of performances, progress and quality of works. The company aggregated materials, equipment, machinery, labor for construction of three perpetual shifts, strove to finish the project in October, 2013, 3 months ahead of schedule.