Basic Information:
Widening Ha Noi Highway was a part of project of fulfilling the increasingly heavy traffic volume, landscaping North-Eastern Gateway, HCM City. Ha Noi Highway crossing areas including Binh Thanh District, District 2,9 and Thu Duc District of HCMC and of Di An ward, Binh Duong Province.
The position based on chainage of right parallel line,
total length: L = 1.92KM
Starting point: : Km2+975.92 ( associated with chainage of main road Km6+766.90)
Ending point: Km4+894.64 ( chainage of main road Km8+700.00).
Capital for package: Project Corporation was Ha Noi Highway construction Joint Stock Company( BOT)
Demension :
Bridge type: Urban road
Design velocity: V=60Km/h (at intersection V= 40Km/h)
Design load: axle 12T
Pavement: hot blacktop with thickness of 12cm ( 5cm fine blacktop+ 7cm medium blacktop
Pavement structure: 5cm fine blacktop+ 7cm medium blacktop+45cm macadam
Sidewalk structure: self-wadded cement brick 10cm+30cm medium sand
Cross section: formation width B=18m( Pavement width:12m, right sidewalk width:5m, left land width: 1m
Located drainage on the right line
Earthworks: none ( except for replacement of soft soil by hard soil)
Located utilities trench along with lines
Workflows: 12 months
Contract Value:… billion VND