<?xml version="1.0" encoding="utf-8"?>
<?xml-stylesheet type="text/xsl" href="/assets/css/rss.xsl" media="screen"?>
<rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom">
	<channel>
		<title>Project - Implementing project</title>
		<link>https://ciiec.com.vn/en/project/rss/Implementing-project/</link>
		<atom:link href="https://ciiec.com.vn/en/project/rss/Implementing-project/" rel="self" type="application/rss+xml" />
				<description>
			<![CDATA[<strong /> CII INFRASTRUCTURE CONSTRUCTION JOINT STOCK COMPANY  has created a portfolio of efficient and well-developed investment projects focusing on three segments of traffic, road bridges , Water infrastructure and real estate infrastructure. These projects have created the foundation for sustainable development for the company.]]>
		</description>
		
		<language>vi</language>
				<pubDate>Wed, 11 Jan 2017 14:01:38 GMT</pubDate>
		<lastBuildDate>Wed, 11 Jan 2017 14:01:38 GMT</lastBuildDate>
		
		<copyright>
			<![CDATA[CII ENGINEERING AND CONSTRUCTION JSC &#40;CII E&amp;C&#41;]]>
		</copyright>
		<docs>https://ciiec.com.vn/en/rss/</docs>
		<generator>
			<![CDATA[NukeViet v4.0]]>
		</generator>
				<image>
			<url>https://ciiec.com.vn/assets/images/logo.png</url>
			<title>Project - Implementing project</title>
			<link>https://ciiec.com.vn/en/project/rss/Implementing-project/</link>
			<width>144</width>
			<height>144</height>
		</image>
		
				<item>
			<title>Hanoi Highway Expanding Project.</title>
			<link>https://ciiec.com.vn/en/project/Implementing-project/Hanoi-Highway-Expanding-Project-3/</link>
						<guid isPermaLink="false">
				<![CDATA[project_3]]>
			</guid>
			
			<description>
				<![CDATA[<img src="/assets/project/xa_lo_ha_noi.jpg" width="100" align="left" border="0">CII E&amp;C is the company in charge of packages of main road and parallel lines. Details following:<br  />
- Building &amp; Installing Package BS1: Build civil roads and barriers (route on the left from Quoc Huong street to Giang Van Minh street, District 2) (completed).<br  />
- Package XL1: Build drainage system of partial investment work of Hanoi Highway (completed).<br  />
- Package XL2: Build routes of partial investment work of Hanoi Highway (completed).<br  />
- Package XL6B: Build routes and drainage system of main road (from the old toll to Southern Cai Lai intersection) (completed).<br  />
- Package XL6F: Build the part of main road at Cat Lai intersection (completed).<br  />
- Package XL1: Build routes and drainage system of main road (from Tay Hoa cross-road to Binh Thai intersection) (completed).<br  />
- Package XL2: Build drainage system of main road (from Binh Thai cross-road to Thu Duc cross-road) (completed).<br  />
- Package XL7: Build routes and drainage system of main road, from Thu Duc intersection to Suoi Cai bridge (completed).<br  />
- Package XL8: Build routes and drainage system of main road from Suoi Cai bridge to Tram 2 intersection (completed).<br  />
- Package XL8A: Build routes and drainage system of main road, from the end of Tram 2 intersection to the beginning of intersection at Vietnam National University (completed).<br  />
- Package SHT-2A: Build parallel lines on the left (from Sai Gon bridge to Rach Chiec bridge) (in progress).<br  />
- Package SHT-6A: Build parallel lines on the left (from Rach Chiec bridge to Thu Duc cross-road intersection) (in progress).<br  />
- Package SHT-8A: Build parallel lines on the left (from Thu Duc cross-road intersection &nbsp;to Suoi Cai bridge) (in progress).<br  />
- Package SHT-10A: Build parallel lines on the left (from Suoi Cai bridge to intersection at Vietnam National University) (in progress).<br  />
- Package SHP-3A: Build parallel lines on the right (from Rach Chiec bridge to People’s Committee of District 9) (in progress).<br  />
- Package SHP-5A: Build parallel lines on the right (from People’s Committee of District 9 to the end of Thu Duc cross-road intersection ) (in progress).<br  />
- Package SHP-7A: Build parallel lines on the right (from the end of Thu Duc cross-road intersection &nbsp;to intersection at Vietnam National University) (in progress).<br  />
- Package SHP-3C: Build parallel lines on the left (from Suoi Cai bridge to intersection at Vietnam National University) (in progress).<br  />
- Package BS2: Build Suoi Cai bridge and reform corresponding ditch (in progress).<br  />
&nbsp;<br  />
&nbsp;<strong>&nbsp;Package Information:</strong><br  />
<strong>PACKAGE SHT-2A: BUILD PARALLEL LINES ON THE LEFT (FROM&nbsp;SAI GON BRIDGE TO RACH CHIEC BRIDGE)</strong><br  />
<strong>*&nbsp;Project</strong>: Hanoi Highway Expanding Project.<br  />
<strong>* General information: </strong>Building and installing package SHT-2A: Build parallel lines on the left (from&nbsp;Sai Gon bridge to Rach Chiec bridge) included in Hanoi Highway Expanding Project, main jobs following:<br  />
-&nbsp;Building surface of roads;<br  />
-&nbsp;Building pavement;<br  />
- Building vertical rain drainage system;<br  />
- Building flyover of water pipes.<br  />
<br  />
<strong>* Duration:&nbsp;18 months.</strong><br  />
<strong>* Contract Value:</strong>&nbsp;140 Billion VND<br  />
*&nbsp;<strong>Location:</strong>&nbsp;<strong>District 2 – Ho Chi Minh City.</strong>&nbsp;<br  />
<strong>PACKAGE SHT-6A:</strong>&nbsp;<strong>BUILD PARALLEL LINES ON THE LEFT (FROM&nbsp;BRIDGE RACH CHIEC TO THU DUC CROSS-ROAD INTERSECTION )</strong><br  />
<strong>*&nbsp;Project</strong>: Hanoi Highway Expanding Project.<br  />
<strong>* General information: </strong>Building and installing package SHT-6A: Build parallel lines on the left (from&nbsp;Rach Chiec bridge to Thu Duc cross-road intersection ) included in Hanoi Highway Expanding Project, main jobs following:<br  />
-&nbsp;Building surface of roads;<br  />
-&nbsp;Building pavement;<br  />
- Building vertical rain drainage system;<br  />
- Building flyover of water pipes.<br  />
<br  />
<strong>* Duration:&nbsp;18 months.</strong><br  />
<strong>* Contract Value:</strong>&nbsp;159,7 Billion VND<br  />
*&nbsp;<strong>Location:</strong>&nbsp;Thu Duc <strong>District &nbsp;– Ho Chi Minh City.</strong>&nbsp;<br  />
<strong>BUILDING AND INSTALLING PACKAGE SHT-8A : BUILD PARALLEL LINES ON THE LEFT (FROM&nbsp;THU DUC CROSS-ROAD TO SUOI CAI BRIDGE)</strong><br  />
<strong>*&nbsp;Project</strong>: Hanoi Highway Expanding Project.<br  />
<strong>* General information: </strong>Building and installing package SHT-8A: Build parallel lines on the left (from&nbsp;Thu Duc cross-road intersection &nbsp;to Suoi Cai bridge) included in Hanoi Highway Expanding Project, main jobs following:<br  />
-&nbsp;Building surface of roads;<br  />
-&nbsp;Building pavement;<br  />
- Building vertical rain drainage system;<br  />
<br  />
<strong>* Duration:&nbsp;12 months.</strong><br  />
<strong>* Contract Value:</strong>&nbsp;64,2 Billion VND<br  />
*&nbsp;<strong>Location:</strong>&nbsp;Thu Duc <strong>District &nbsp;– Ho Chi Minh City.</strong>&nbsp;<br  />
<strong>BUILDING AND INSTALLING PACKAGE SHT-10A : BUILD PARALLEL LINES ON THE LEFT (FROM SUOI CAI BRIDGE TO INTERSECTION AT VNU)</strong><br  />
<strong>*&nbsp;Project</strong>: Hanoi Highway Expanding Project.<br  />
<strong>* General information: </strong>Building and installing package SHT-10A: Build parallel lines on the left (from&nbsp;Suoi Cai bridge to intersection at VNU) included in Hanoi Highway Expanding Project, main jobs following:<br  />
-&nbsp;Building surface of roads;<br  />
-&nbsp;Building pavement;<br  />
- Building vertical rain drainage system;<br  />
<br  />
<strong>* Duration:&nbsp;12 months.</strong><br  />
<strong>* Contract Value:</strong>&nbsp;46,6 Billion VND<br  />
*&nbsp;<strong>Location:</strong>&nbsp;Thu Duc <strong>District – Ho Chi Minh City.</strong>&nbsp;<br  />
&nbsp;<br  />
<strong>BUILDING AND INSTALLING PACKAGE SHP-3A: BUILD PARALLEL LINES ON THE RIGHT (FROM RACH CHIEC BRIDGE TO PEOPLE’S COMMITTEE OF DISTRICT 9)</strong><br  />
<strong>*&nbsp;Project</strong>: Hanoi Highway Expanding Project.<br  />
<strong>* General information: </strong>Building and installing package SHP-3A: Build parallel lines on the right (from&nbsp;Rach Chiec bridge to People’s Committee of District 9) included in Hanoi Highway Expanding Project, main jobs following:<br  />
-&nbsp;Building surface of roads;<br  />
-&nbsp;Building pavement;<br  />
- Building vertical rain drainage system;<br  />
<br  />
<strong>* Duration:&nbsp;15 months.</strong><br  />
<strong>* Contract Value:</strong>&nbsp;105, 9 Billion VND<br  />
*&nbsp;<strong>Location:</strong>&nbsp; <strong>District 9 – Ho Chi Minh City.</strong>&nbsp;<br  />
&nbsp;<br  />
<strong>BUILDING AND INSTALLING PACKAGE SHP-5A : BUILD PARALLEL LINES ON THE RIGHT (FROM PEOPLE’S COMMITTEE OF DISTRICT 9 TO THE END OF THU DUC CROSS-ROAD INTERSECTION )</strong><br  />
<strong>*&nbsp;Project</strong>: Hanoi Highway Expanding Project.<br  />
<strong>* General information: </strong>Building and installing package SHP-5A: Build parallel lines on the right (from&nbsp; People’s Committee of District 9 to the end of Thu Duc cross-road intersection ) included in Hanoi Highway Expanding Project, main jobs following:<br  />
-&nbsp;Building surface of roads;<br  />
-&nbsp;Building pavement;<br  />
- Building vertical rain drainage system;<br  />
<br  />
<strong>* Duration:&nbsp;11 months.</strong><br  />
<strong>* Contract Value:</strong>&nbsp;50,5 Billion VND<br  />
*&nbsp;<strong>Location:</strong>&nbsp; <strong>District 9 – Ho Chi Minh City.</strong>&nbsp;<br  />
&nbsp;<br  />
&nbsp;<strong>BUILDING AND INSTALLING PACKAGE SHP-7A : BUILD PARALLEL LINES ON THE RIGHT (FROM THE END OF THU DUC CROSS-ROAD INTERSECTION &nbsp;TO INTERSECTION AT VIETNAM NATIONAL UNIVERSITY)</strong><br  />
<strong>*&nbsp;Project</strong>: Hanoi Highway Expanding Project.<br  />
<strong>* General information: </strong>Building and installing package SHP-7A: Build parallel lines on the right (from the end of Thu Duc cross-road intersection &nbsp;to intersection at VNU) included in Hanoi Highway Expanding Project, main jobs following:<br  />
-&nbsp;Building surface of roads;<br  />
-&nbsp;Building pavement;<br  />
- Building vertical rain drainage system;<br  />
<br  />
<strong>* Duration:&nbsp;14 months.</strong><br  />
<strong>* Contract Value:</strong>&nbsp;107 Billion VND<br  />
*&nbsp;<strong>Location:</strong>&nbsp; <strong>District 9 – Ho Chi Minh City.</strong>&nbsp;<br  />
&nbsp;<br  />
<strong>BUILDING AND INSTALLING PACKAGE SHP-3C : </strong><strong>PLANTING AND TITLING PAVEMENT OF THE PARALLEL LINES ON THE RIGHT (FROM RACH CHIEC BRIDGE TO INTERSECTION AT VNU)</strong><br  />
<strong>*&nbsp;Project</strong>: Hanoi Highway Expanding Project.<br  />
<strong>* General information: </strong>Building and installing package SHP-3C: Planting and titling pavement of the parallel lines on the right (from Rach Chiec bridge to intersection at VNU) included in Hanoi Highway Expanding Project, main jobs following:<br  />
-&nbsp;Titling pavement<br  />
-&nbsp;Planting<br  />
<strong>* Duration:&nbsp;15 months.</strong><br  />
<strong>* Contract Value:</strong>&nbsp;15, 3 Billion VND<br  />
*&nbsp;<strong>Location:</strong>&nbsp; <strong>District 9 – Ho Chi Minh City.</strong>&nbsp;<br  />
&nbsp;<br  />
<strong>BUILDING AND INSTALLING PACKAGE 7 : BUILD ROADS AND DRAINAGE SYSTEM OF MAIN ROAD (FROM THU DUC INTERSECTION TO SUOI CAI BRIDGE)</strong><br  />
<strong>*&nbsp;Project</strong>: Hanoi Highway Expanding Project.<br  />
<strong>* General information: </strong>Building and installing package SHP-7: build roads and drainage system of main road (from thu duc intersection to suoi cai bridge) included in Hanoi Highway Expanding Project, main jobs following:<br  />
-&nbsp;Building surface of roads;<br  />
- Building vertical rain drainage system;<br  />
<strong>* Duration:&nbsp;… months.</strong><br  />
<strong>* Contract Value:</strong>&nbsp;46,3 Billion VND<br  />
*&nbsp;<strong>Location:</strong>&nbsp; <strong>District 9 and Thu Duc District – Ho Chi Minh City.</strong>&nbsp;<br  />
<strong>BUILDING AND INSTALLING PACKAGE 8 : BUILD ROADS AND DRAINAGE SYSTEM OF MAIN ROAD (FROM SUOI CAI BRIDGE TO NORTHERN TRAM 2)</strong><br  />
<strong>*&nbsp;Project</strong>: Hanoi Highway Expanding Project.<br  />
<strong>* General information: </strong>building and installing package 8 : build roads and drainage system of main road (from Suoi Cai bridge to Northern Tram 2) included in Hanoi Highway Expanding Project, main jobs following:<br  />
-&nbsp;Building surface of roads;<br  />
- Building vertical rain drainage system;<br  />
<strong>* Duration:&nbsp;… months.</strong><br  />
<strong>* Contract Value:</strong>&nbsp;79,9 Billion VND<br  />
*&nbsp;<strong>Location:</strong>&nbsp; <strong>District 9 and Thu Duc District – Ho Chi Minh City.</strong>&nbsp;<br  />
&nbsp;<br  />
<strong>BUILDING AND INSTALLING PACKAGE 8A : BUILD ROADS AND DRAINAGE SYSTEM OF MAIN ROAD (ĐOẠN FROM BẮC TRẠM 2 TO INTERSECTION VIETNAM NATIONAL UNIVERSITY)</strong><br  />
<strong>*&nbsp;Project</strong>: Hanoi Highway Expanding Project.<br  />
<strong>* General information: </strong>building and installing package 8A : build roads and drainage system of main road (from Northern Tram 2 to intersection at VNU) included in Hanoi Highway Expanding Project, main jobs following:<br  />
-&nbsp;Building surface of roads;<br  />
- Building vertical rain drainage system;<br  />
- Installing horizontal box drain (2.5x2.5)m prolonged at Km11 + 718.50<br  />
<strong>* Duration: 6 months.</strong><br  />
*&nbsp;<strong>Location:</strong>&nbsp; <strong>District 9 and Thu Duc District – Ho Chi Minh City.</strong>&nbsp;]]>
			</description>
						<pubDate>Wed, 11 Jan 2017 14:01:04 GMT</pubDate>
			
		</item>
		
		<item>
			<title>Trung Luong - My Thuan Expressway Stage 1</title>
			<link>https://ciiec.com.vn/en/project/Implementing-project/Trung-Luong-My-Thuan-Expressway-Stage-1-7/</link>
						<guid isPermaLink="false">
				<![CDATA[project_7]]>
			</guid>
			
			<description>
				<![CDATA[<img src="/assets/project/trung_luong_my_thuan.jpg" width="100" align="left" border="0"><p style="text-align: justify;"><strong>General Information:</strong><br  />
Expressway from HCMC to Can Tho is a part of North-South expressway axis. Prior - Viability researching report was approved by Minister in May, 2015.<br  />
This route always serves one of the greatest amount of traffic all over Vietnam.<br  />
The expressway has been currently building 40km completely from HCMC to Trung Luong.<br  />
Finishing expressway from HCMC to Can Tho, investment in the rest on Trung Luong-My Thuan route and My Thuan-Can Tho route, in particular, contribute to forming the route network in developing and completing nationwide route network program.<br  />
Follow Minister’s leading words on deploying BOT projects on transportations, BIDV Vietnam has been delegated to establish expressway Trung Luong – My Thuan - Can Tho investment company as a BOT company.<br  />
BIDV Expressway Development Joint Stock (BEDC) was founded to invest and construct Expressway from Trung Luong to Can Tho.<br  />
On the basis of suggesting project passed by Ministry of Transports (Document 343/QĐ-BGTVT on Feb 4<sup>th</sup>, 2008), Transportation TVTK Company carried out &nbsp;Expressway Trung Luong – My Thuan - Can Tho project.<br  />
The project was assessed by Ministry of Transports (Document 7910/BGTVT-KHĐT on Oct 28<sup>th</sup> , 2008) and was approved by BEDC Board of Directors (Document 007/QĐ-HĐQT on March, 26<sup>th</sup>, 2009).<br  />
The projects has complied with route directions, cross-section scale, scale and location of bridges and intersections in project plan as well as in assessment report by Ministry of Transports.<br  />
On the basis of suggestions by BEDC, Minister has approved the separating project into projects with different investors and different forms of investment:<br  />
- Trung Luong – My Thuan Expressway in form of BOT, the investor is BEDC. The project started on November 29<sup>th</sup>, 2009 and BEDC approved to adjust the project with Document 021/QĐ-HĐQT on January 11<sup>th</sup>, 2010.<br  />
- My Thuan - Can Tho Expressway, the investor is My Thuan Project Management (now is Cuu Long CIPM). Project was approved by Ministry of Transports at Document 650/QĐ-BGTVT on April 4<sup>th</sup>, 2011</p>

<table border="1" cellpadding="0" cellspacing="0" style="width:100.0%;" width="100%">
	<tbody>
		<tr>
			<td style="width: 8.08%; text-align: justify;"><strong>TT</strong></td>
			<td style="width: 65.66%; text-align: justify;"><strong>Standards</strong></td>
			<td style="width: 26.26%; text-align: justify;"><strong>Code</strong></td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">1</td>
			<td style="width: 65.66%; text-align: justify;">Expressway requiring design</td>
			<td style="width: 26.26%; text-align: justify;">TCVN 5729-97</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">2</td>
			<td style="width: 65.66%; text-align: justify;">Direction Sign on Expressway</td>
			<td style="width: 26.26%; text-align: justify;">22TCN 331-05</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">3</td>
			<td style="width: 65.66%; text-align: justify;">Standards of bridge design&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
			<td style="width: 26.26%; text-align: justify;">22TCN 272-05</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">4</td>
			<td style="width: 65.66%; text-align: justify;">Traffic Construction in Earthquake area –</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 211-95</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">5</td>
			<td style="width: 65.66%; text-align: justify;">Pile foundation - Standards of design</td>
			<td style="width: 26.26%; text-align: justify;">20TCN 21-86</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">6</td>
			<td style="width: 65.66%; text-align: justify;">Pre-stressed concrete hook T13, T15 &amp; D13, D15</td>
			<td style="width: 26.26%; text-align: justify;">22TCN 267-2000</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">7</td>
			<td style="width: 65.66%; text-align: justify;">Bridge rubber plate bearing</td>
			<td style="width: 26.26%; text-align: justify;">AASHTO M251-96</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">8</td>
			<td style="width: 65.66%; text-align: justify;">Technical survey for pile foundation design and construction</td>
			<td style="width: 26.26%; text-align: justify;">20TCN 160-87</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">9</td>
			<td style="width: 65.66%; text-align: justify;">Geological Survey Drilling&nbsp; Process</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 259-2000</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">10</td>
			<td style="width: 65.66%; text-align: justify;">Standard of elastic gap</td>
			<td style="width: 26.26%; text-align: justify;">AASHTO M297-96<br  />
			AASHTO M183-96</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">11</td>
			<td style="width: 65.66%; text-align: justify;">Calculation on typical flow of flood</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 260-2000</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">12</td>
			<td style="width: 65.66%; text-align: justify;">Technical classification of domestic river route</td>
			<td style="width: 26.26%; text-align: justify;">TCVN 5664-92</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">13</td>
			<td style="width: 65.66%; text-align: justify;">Geological Survey Process of waterway construction</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 260-2000</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">14</td>
			<td style="width: 65.66%; text-align: justify;">Design Survey Process of highway foundation the weak ground</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 262-2000</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">15</td>
			<td style="width: 65.66%; text-align: justify;">Highway Examining Process</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 263-2000</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">16</td>
			<td style="width: 65.66%; text-align: justify;">Highway – Require standard design (for side roads, frontage road, linking road to expressway)</td>
			<td style="width: 26.26%; text-align: justify;">TCVN 4054 -05</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">17</td>
			<td style="width: 65.66%; text-align: justify;">Design process of hard road cover.</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 223-95</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">18</td>
			<td style="width: 65.66%; text-align: justify;">Design process of soft road cover.</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 211-06</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">19</td>
			<td style="width: 65.66%; text-align: justify;">Road signal regulation</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 237- 01</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">20</td>
			<td style="width: 65.66%; text-align: justify;">Design process of bridges and drains in limited situation (applied for drain design)</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 18-79**</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">21</td>
			<td style="width: 65.66%; text-align: justify;">Geological Survey and stabilizing method design Process of road foundation with slide act and collapse</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 171-87</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">22</td>
			<td style="width: 65.66%; text-align: justify;">Assessing process on environment effects on project and design</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 242-98</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">23</td>
			<td style="width: 65.66%; text-align: justify;">Urban routes – require design</td>
			<td style="width: 26.26%; text-align: justify;">TCXDVN 104-2007</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">24</td>
			<td style="width: 65.66%; text-align: justify;">Standard of road design (intersection)</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 273-01</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">25</td>
			<td style="width: 65.66%; text-align: justify;">Design standards on human-made lighting on road, street, urban square.</td>
			<td style="width: 26.26%; text-align: justify;">TCXDVN 259:2001<br  />
			&nbsp; TCXDVN 333:2005</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">26</td>
			<td style="width: 65.66%; text-align: justify;">Technical requirement and experiment method on POLIME concrete.</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 319-04</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">27</td>
			<td style="width: 65.66%; text-align: justify;">CPT and CPTU</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 320-2004</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">28</td>
			<td style="width: 65.66%; text-align: justify;">Design Standard (for side roads, frontage road )</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 210-92</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">29</td>
			<td style="width: 65.66%; text-align: justify;">Topographic regulation</td>
			<td style="width: 26.26%; text-align: justify;">96 TCN 43-90</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">30</td>
			<td style="width: 65.66%; text-align: justify;">Design and Handling Design Process on weak ground with absorbing rush</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 244-98</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">31</td>
			<td style="width: 65.66%; text-align: justify;">Technical-geo cloth in foundation building on weak ground</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 248-98</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">32</td>
			<td style="width: 65.66%; text-align: justify;">Geodetic task in construction – general requirement</td>
			<td style="width: 26.26%; text-align: justify;">TCVN 309-2004</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">33</td>
			<td style="width: 65.66%; text-align: justify;">Standard of solid road concrete – technical requirement and experiment methods</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 279-01</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">34</td>
			<td style="width: 65.66%; text-align: justify;">Pile drill – design, construct, acceptance</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 257 - 2000</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">35</td>
			<td style="width: 65.66%; text-align: justify;">Design standard of tuynen</td>
			<td style="width: 26.26%; text-align: justify;">11 TCN 19-84</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">36</td>
			<td style="width: 65.66%; text-align: justify;">Iron Structure – design standard</td>
			<td style="width: 26.26%; text-align: justify;">TCXDVN 338-2005</td>
		</tr>
		<tr>
			<td style="width: 8.08%; text-align: justify;">37</td>
			<td style="width: 65.66%; text-align: justify;">Design of drainage system outside of work</td>
			<td style="width: 26.26%; text-align: justify;">22 TCN 51-84</td>
		</tr>
	</tbody>
</table>

<p style="text-align: justify;">&nbsp;<br  />
&nbsp;</p>]]>
			</description>
						<pubDate>Wed, 11 Jan 2017 14:01:10 GMT</pubDate>
			
		</item>
		
		<item>
			<title>Highway 60 project</title>
			<link>https://ciiec.com.vn/en/project/Implementing-project/Highway-60-project-9/</link>
						<guid isPermaLink="false">
				<![CDATA[project_9]]>
			</guid>
			
			<description>
				<![CDATA[<img src="/assets/project/khoi-cong-ql60.jpg" width="100" align="left" border="0"><p><strong>Highway 60 project</strong><br  />
<strong>Detail:</strong><br  />
<strong>*&nbsp;Project</strong>:&nbsp;Highway 60 Expanding Project.&nbsp;<br  />
*&nbsp;<strong>Location</strong>: Tien Giang Province.<br  />
<strong>* General Information:</strong></p>

<ul>
	<li>Value: 547.36 billion VND(can be changed cause of HS adjustment).</li>
	<li>Length: 11,454Km.</li>
	<li>Bridge: 6 bridges.</li>
	<li>Horizontal Drain: 20 points.</li>
	<li>Vertical Drain: 1205.98m.</li>
	<li>Duration: 26 months.</li>
</ul>
&nbsp;<br  />
<strong>&nbsp; &nbsp; &nbsp;Package details:</strong><br  />
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; +&nbsp;<em>Package XL-01</em>:

<ul>
	<li>Value: 103.5 billion VND</li>
	<li>Length: 4.456m</li>
	<li>Bridge: none</li>
	<li>Horizontal Drain: 9 points.</li>
	<li>Vertical Drain: 1205.98m.</li>
</ul>
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;+Package<em> XL-04</em>:

<ul>
	<li>Value: 145.46 billion VND</li>
	<li>Length: 2.297,96m</li>
	<li>Bridge: 2 bridges (Mo Cay bridge and Bridge 5).</li>
	<li>Horizontal Drain: 6 points.</li>
	<li>Vertical Drain: 0m.</li>
</ul>
&nbsp;<br  />
<em>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;+ Package XL-05:</em>

<ul>
	<li>Value: 140.2 billion VND</li>
	<li>Length: 2.297,96m</li>
	<li>Bridge: 2 bridges (An Vinh bridge and Ong Hieu Bridge).</li>
	<li>Horizontal Drain: 3 points.</li>
	<li>Vertical Drain: 0m.</li>
</ul>
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; +&nbsp;<em>Package XL-06</em>:

<ul>
	<li>Value: 158.2 billion VND (in plan)</li>
	<li>Length: 2.500m.</li>
	<li>Bridge: 2 bridges (Muong Dieu bridge and Binh Quoi Bridge).</li>
	<li>Horizontal Drain: 2 points.</li>
	<li>Vertical Drain: 0m.</li>
</ul>

<p>&nbsp;</p>]]>
			</description>
						<pubDate>Wed, 11 Jan 2017 14:01:07 GMT</pubDate>
			
		</item>
		
		<item>
			<title>Thu Thiem Lake View 1</title>
			<link>https://ciiec.com.vn/en/project/Implementing-project/Thu-Thiem-Lake-View-1-12/</link>
						<guid isPermaLink="false">
				<![CDATA[project_12]]>
			</guid>
			
			<description>
				<![CDATA[<img src="/assets/project/lakeview1-1.jpg" width="100" align="left" border="0"><p><strong>*</strong><strong>&nbsp;</strong><strong>Project</strong>:&nbsp;<strong>Investment on Thu Thiem Residential Area</strong></p>

<p><strong>* Work name : Thu&nbsp;Thiem LakeView 1</strong></p>

<p>*&nbsp;<strong>Location</strong>:<strong>Thu&nbsp;Thiem New Urban Area -&nbsp;District 2&nbsp;- HCMC.</strong></p>

<p><strong>&nbsp;</strong></p>

<p><img alt="lakeview1 1" border="0" height="639" src="/uploads/project/lakeview1-1.jpg" width="960" /></p>

<p><em>Image 1 - Thu&nbsp;Thiem Lakeview 1</em></p>

<p>&nbsp;<img alt="lakeview1 2" border="0" height="960" src="/uploads/project/lakeview1-2.jpg" width="960" /></p>

<p><em>Image 2 - Thu&nbsp;Thiem Lakeview 1</em></p>

<p><img alt="lakeview1 4" border="0" height="604" src="/uploads/project/lakeview1-4.jpg" width="960" /></p>

<p><em>Image 3 - Thu&nbsp;Thiem Lakeview 1</em></p>

<p><img alt="lakeview1 5" border="0" height="600" src="/uploads/project/lakeview1-5.jpg" width="960" /></p>

<p><em>Image 4 - Thu&nbsp;Thiem Lakeview 1</em></p>]]>
			</description>
						<pubDate>Wed, 11 Jan 2017 14:01:02 GMT</pubDate>
			
		</item>
		
		<item>
			<title>Thu Thiem New Urban Area Technical Infrastructure Project</title>
			<link>https://ciiec.com.vn/en/project/Implementing-project/Thu-Thiem-New-Urban-Area-Technical-Infrastructure-Project-13/</link>
						<guid isPermaLink="false">
				<![CDATA[project_13]]>
			</guid>
			
			<description>
				<![CDATA[<img src="/assets/project/du_an_thu_thiem_22.jpg" width="100" align="left" border="0"><p><strong>*&nbsp;Project: </strong>Investing Engineering and Infrastructure on Northern Residential Area (functional area no.3 and no.4), finishing North-South axis (From the foot of Thu Thiem 1 Bridge to Mai Chi Tho Street) in Thu Thiem New Urban Area in form of BT Contract.<br  />
<strong>* General Information&nbsp;:</strong><br  />
Start to build and install package XL1 in Investing Engineering and Infrastructure on Northern Residential Area (functional area no.3 and no.4), finishing North-South axis (From the foot of Thu Thiem 1 Bridge to Mai Chi Tho Street) in Thu Thiem New Urban Area, main tasks following:</p>

<table border="0" cellpadding="0" cellspacing="0">
	<tbody>
		<tr>
			<td style="width:571px;">+ Construct ground route R14;</td>
		</tr>
		<tr>
			<td style="width:571px;">+ Construct ground route N1&#039;, N2&#039;;</td>
		</tr>
		<tr>
			<td style="width:571px;">+ Construct ground of the rest;</td>
		</tr>
		<tr>
			<td style="width:571px;">+ Construct Ca Tre Bridge;</td>
		</tr>
		<tr>
			<td style="width:571px;">+ Construct D1 Street.</td>
		</tr>
	</tbody>
</table>

<p><strong>* Duration&nbsp;:&nbsp;</strong>18 months<br  />
*&nbsp;<strong>Location</strong>:&nbsp;<strong>District 2 - HCMC.</strong><br  />
<strong>* Scale :</strong><br  />
Contract Value is temporarily decided on the basis of total investment approved, 1 319.692 billion VND (one thousand three hundred nineteen billion and six hundred ninety-two million VND). Contract Value will be adjusted in the official contract according to plan and total plan assessed by authority and investor. &nbsp;</p>

<p>&nbsp;<img alt="thu thiem 2png" border="0" height="635" src="/uploads/project/thu-thiem-2png.png" width="1361" /></p>

<p>Image - Overall Map</p>]]>
			</description>
						<pubDate>Wed, 11 Jan 2017 14:01:38 GMT</pubDate>
			
		</item>
		
	</channel>
</rss>