<?xml version="1.0" encoding="utf-8"?>
<?xml-stylesheet type="text/xsl" href="/assets/css/rss.xsl" media="screen"?>
<rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom">
	<channel>
		<title>Project - Completed projects</title>
		<link>https://ciiec.com.vn/en/project/rss/Completed-projects/</link>
		<atom:link href="https://ciiec.com.vn/en/project/rss/Completed-projects/" rel="self" type="application/rss+xml" />
				<description>
			<![CDATA[<strong /> CII INFRASTRUCTURE CONSTRUCTION JOINT STOCK COMPANY  has created a portfolio of efficient and well-developed investment projects focusing on three segments of traffic, road bridges , Water infrastructure and real estate infrastructure. These projects have created the foundation for sustainable development for the company.]]>
		</description>
		
		<language>vi</language>
				<pubDate>Thu, 30 Mar 2017 13:03:24 GMT</pubDate>
		<lastBuildDate>Thu, 30 Mar 2017 13:03:24 GMT</lastBuildDate>
		
		<copyright>
			<![CDATA[CII ENGINEERING AND CONSTRUCTION JSC &#40;CII E&amp;C&#41;]]>
		</copyright>
		<docs>https://ciiec.com.vn/en/rss/</docs>
		<generator>
			<![CDATA[NukeViet v4.0]]>
		</generator>
				<image>
			<url>https://ciiec.com.vn/assets/images/logo.png</url>
			<title>Project - Completed projects</title>
			<link>https://ciiec.com.vn/en/project/rss/Completed-projects/</link>
			<width>144</width>
			<height>144</height>
		</image>
		
				<item>
			<title>Route Project&#x3A; Inter-province route 25B</title>
			<link>https://ciiec.com.vn/en/project/Completed-projects/Route-Project-Inter-province-route-25B-2/</link>
						<guid isPermaLink="false">
				<![CDATA[project_2]]>
			</guid>
			
			<description>
				<![CDATA[<img src="/assets/project/tuyen-duong-25b.jpg" width="100" align="left" border="0">Details:<br  />
Route Project: Inter-province route 25B CII successfully constructed beyond workflow, contributed to slow down traffic jam, clear goods at Cat Lai port, guarantee to load a great amount of traffic crossing Phu My bridge and Dong Tay Avenue.]]>
			</description>
						<pubDate>Wed, 11 Jan 2017 14:01:42 GMT</pubDate>
			
		</item>
		
		<item>
			<title>Bypass of 1A National Road, Phan Rang- Cham Tower</title>
			<link>https://ciiec.com.vn/en/project/Completed-projects/Bypass-of-1A-National-Road-Phan-Rang-Cham-Tower-4/</link>
						<guid isPermaLink="false">
				<![CDATA[project_4]]>
			</guid>
			
			<description>
				<![CDATA[<img src="/assets/project/670x340-cau-dao-long-3.jpg" width="100" align="left" border="0">CII constructed 2 major packages of projects: Package 1: Dao Long 2 Bridge and package 4: widening road. After the project was finished, it helped release traffic flow on 1A National road, Phan Rang- Cham Tower section, promoted socioeconomic development in locale and entourage.]]>
			</description>
						<pubDate>Wed, 11 Jan 2017 14:01:50 GMT</pubDate>
			
		</item>
		
		<item>
			<title>Sai Gon 2 Bridge</title>
			<link>https://ciiec.com.vn/en/project/Completed-projects/Sai-Gon-2-Bridge-5/</link>
						<guid isPermaLink="false">
				<![CDATA[project_5]]>
			</guid>
			
			<description>
				<![CDATA[<img src="/assets/project/da-hoan-thanh-2.jpg" width="100" align="left" border="0"><p>Detail: SAI Gon 2 bridge Project<br  />
Total investment: 1.495 billion VND<br  />
Construction period: 18 months (3 months ahead of schedule)<br  />
Basic information: As approved project, Sai Gon 2 bridge located toward lower reach ( on the right side of the direction from Binh Thanh district to district 2) of the current Sai Gon, starting point connected with Dien Bien Phu street, Ending point connected with BOT project of widening Ha Noi highway, Sai Gon 2 bridge was constructed by reinforced concrete and pre-stressed concrete<br  />
Lifetime: 100 years<br  />
Total length of bridge: 987.32m, 30 bridge spans,<br  />
Bridge width: 23.5m<br  />
Gravity load: live load HL-93<br  />
Pedestrian: 3x10-3 Mpa<br  />
Shock load: self-propelled ship 1000DWT, tugging barge 500DWT<br  />
Earthquake load: level 7 ( MSK-64 scale)<br  />
Navigational clearance: B x H = 80 m x 9m<br  />
&nbsp;Height clearance of under-grade crossing: H = 4,50m and H=4,75m<br  />
The length of approach embankment of Binh Thanh District: 250m, of district 2: 117m<br  />
Bridge level: Main urban road, level 1<br  />
Technique level: level 80<br  />
Design velocity: 80km/h<br  />
Relieving floor for bridge head and bridge end: succeed after 2 abutments<br  />
Relieving floor was made of reinforcement on reinforce cement pile bottom<br  />
Importance of project<br  />
Sai Gon 2 Bridge was one out of five major construction projects of HCMC in 2013. CII was one out of three joint ventures of this project. Awarded of responsibility and great pleasure of being assigned for Sai Gon 2 construction Project, CII had made a great effort to accelerate the progress as soon as starting the project.<br  />
As an efficient and experienced company in traffic infrastructure construction field, we guaranteed the efficiency of performances, progress and quality of works. The company aggregated materials, equipment, machinery, labor for construction of three perpetual shifts, strove to finish the project in October, 2013, 3 months ahead of schedule.</p>]]>
			</description>
						<pubDate>Wed, 11 Jan 2017 14:01:17 GMT</pubDate>
			
		</item>
		
		<item>
			<title>Vong Bridge Project</title>
			<link>https://ciiec.com.vn/en/project/Completed-projects/Vong-Bridge-Project-6/</link>
						<guid isPermaLink="false">
				<![CDATA[project_6]]>
			</guid>
			
			<description>
				<![CDATA[<img src="/assets/project/cauvong.jpg" width="100" align="left" border="0"><p style="text-align: justify;">General&nbsp;Information:<br  />
Range for construction: Km4+230.41 – Km4+693.41 (L=463m) belongs to “ Upgrade, widen National Highway 53( on segment) Km0+000 – Km7+722.53,segment 2: Km4+000 – Km4+722.53”,<br  />
Feasibility studying project of&nbsp;Vinh Long Province was approvedby Ministry of Transport according to 4691/QĐ-GTVT December 28<sup>th</sup>,2001<br  />
Captital for package: Government bond, municipal revenue<br  />
Demension :<br  />
Bridge type: Prestressed concrete bridge<br  />
Liftime: Permanent<br  />
Length: L=232.3m (including behind abutment)<br  />
Bridge spans: including 7 bridge spans, each of 33m<br  />
Design load: fleet H-30, accounted by XB-80, pedestrians load: 300KG/m2;<br  />
Cross section of bridge: 11.0m,( carriage way: 8m, pavement: 2.5m,safety lane: 0.5m), including 6 beams L33m<br  />
Supported pier by reinforced concrete on pile foundation width D1000, L=48-50m<br  />
Earthquake load: level 6<br  />
Gravity and ship load: equal to river level 5<br  />
Clearance for navigation: H=3.5m(calculating from water frequency 5%), B= 25m<br  />
Height of Local load: &gt;= 2.5m calculating from current height<br  />
Breadth counts on the width of the current local load.<br  />
Workflow: 24 months<br  />
Contract Value :… billion VND</p>]]>
			</description>
						<pubDate>Wed, 11 Jan 2017 14:01:44 GMT</pubDate>
			
		</item>
		
		<item>
			<title>HCM Street Project &#40;Nam Can – Dat Mui, Ca Mau province&#41;</title>
			<link>https://ciiec.com.vn/en/project/Completed-projects/HCM-Street-Project-Nam-Can-Dat-Mui-Ca-Mau-province-8/</link>
						<guid isPermaLink="false">
				<![CDATA[project_8]]>
			</guid>
			
			<description>
				<![CDATA[<img src="/assets/project/670x340-xa-lo-ha-noi-19.jpg" width="100" align="left" border="0"><p><strong>Detail:</strong><br  />
HCM Street Project (Nam Can – Dat Mui, Ca Mau province)<br  />
<strong>General Information:</strong><br  />
HCM Street is vital route in Vietnam. Parts are in progress, about 3.167 km long. HCMC Street is also the second one from North to South, crossing Western mountainous area, along with 1A National Road, locates mostly in Eastern Coastal Delta.<br  />
This route has being built on the basis of upgrading and expanding countryside roads and national roads. Parts on the basis of available roads are called segment of national road/countryside road.<br  />
On December 3<sup>rd</sup>, 2004, 6<sup>th</sup> meeting, XI, National Assembly of Vietnam has enforced Document 38/2004/QH11 of construction and investment undertaking of HCM street, confirmed it as vital nationwide project.<br  />
&nbsp;<br  />
Main Route of HCM Street runs across following locations:<br  />
<a href="http://vi.wikipedia.org/wiki/P%C3%A1c_B%C3%B3" title="Pác Bó">Pác Bó</a>,&nbsp;Cao Bằng <a href="http://vi.wikipedia.org/wiki/Th%E1%BB%8B_x%C3%A3_Cao_B%E1%BA%B1ng" title="Thị xã Cao Bằng">town </a>,&nbsp;Bắc Kạn <a href="http://vi.wikipedia.org/wiki/Th%E1%BB%8B_x%C3%A3_B%E1%BA%AFc_K%E1%BA%A1n" title="Thị xã Bắc Kạn">town </a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/Ch%E1%BB%A3_M%E1%BB%9Bi,_B%E1%BA%AFc_K%E1%BA%A1n" title="Chợ Mới, Bắc Kạn">Chợ Mới, Bắc Kạn</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/Ch%E1%BB%A3_Chu" title="Chợ Chu">Chu</a> Market,&nbsp;<a href="http://vi.wikipedia.org/w/index.php?title=%C4%90%C3%A8o_Mu%E1%BB%93ng&amp;action=edit&amp;redlink=1" title="Đèo Muồng (trang chưa được viết)">Muồng</a> Pass , &nbsp;Trung Sơn intersection , <a href="http://vi.wikipedia.org/wiki/Ph%C3%BA_Th%E1%BB%8Bnh" title="Phú Thịnh">Phú Thịnh</a> intersection ,&nbsp;<a href="http://vi.wikipedia.org/wiki/C%E1%BA%A7u_B%C3%ACnh_Ca" title="Cầu Bình Ca">Bình Ca</a> bridge&nbsp;(<a href="http://vi.wikipedia.org/wiki/S%C3%B4ng_L%C3%B4" title="Sông Lô">sông Lô</a>), Km124+500&nbsp;<a href="http://vi.wikipedia.org/wiki/Qu%E1%BB%91c_l%E1%BB%99_2" title="Quốc lộ 2"> National Road 2</a>, intersection&nbsp;<a href="http://vi.wikipedia.org/wiki/Ph%C3%BA_H%E1%BB%99" title="Phú Hộ">Phú Hộ</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/Th%E1%BB%8B_x%C3%A3_Ph%C3%BA_Th%E1%BB%8D" title="Thị xã Phú Thọ">town Phú Thọ</a>,&nbsp;<a href="http://vi.wikipedia.org/w/index.php?title=C%E1%BA%A7u_Ng%E1%BB%8Dc_Th%C3%A1p&amp;action=edit&amp;redlink=1" title="Cầu Ngọc Tháp (trang chưa được viết)">bridge &nbsp;Ngọc Tháp</a>&nbsp;(<a href="http://vi.wikipedia.org/wiki/S%C3%B4ng_H%E1%BB%93ng" title="Sông Hồng">sông Hồng</a>),&nbsp;<a href="http://vi.wikipedia.org/wiki/C%E1%BB%95_Ti%E1%BA%BFt" title="Cổ Tiết">Cổ Tiết</a>,&nbsp;Trung Hà <a href="http://vi.wikipedia.org/w/index.php?title=C%E1%BA%A7u_Trung_H%C3%A0&amp;action=edit&amp;redlink=1" title="Cầu Trung Hà (trang chưa được viết)">bridge &nbsp;</a>,&nbsp;Sơn Tây <a href="http://vi.wikipedia.org/wiki/Th%E1%BB%8B_x%C3%A3_S%C6%A1n_T%C3%A2y" title="Thị xã Sơn Tây">town </a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/H%C3%B2a_L%E1%BA%A1c" title="Hòa Lạc">Hòa Lạc</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/Xu%C3%A2n_Mai" title="Xuân Mai">Xuân Mai</a>,&nbsp;<a href="http://vi.wikipedia.org/w/index.php?title=Ch%E1%BB%A3_B%E1%BA%BFn&amp;action=edit&amp;redlink=1" title="Chợ Bến (trang chưa được viết)">Chợ Bến</a>,&nbsp;<a href="http://vi.wikipedia.org/w/index.php?title=X%C3%B3m_Kho&amp;action=edit&amp;redlink=1" title="Xóm Kho (trang chưa được viết)">Xóm Kho</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/Ng%E1%BB%8Dc_L%E1%BA%B7c" title="Ngọc Lặc">Ngọc Lặc</a>,&nbsp;<a href="http://vi.wikipedia.org/w/index.php?title=L%C3%A2m_La&amp;action=edit&amp;redlink=1" title="Lâm La (trang chưa được viết)">Lâm La</a>,&nbsp;Thái Hòa <a href="http://vi.wikipedia.org/wiki/Th%E1%BB%8B_x%C3%A3_Th%C3%A1i_H%C3%B2a" title="Thị xã Thái Hòa">Town </a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/T%C3%A2n_K%E1%BB%B3" title="Tân Kỳ">Tân Kỳ</a>,&nbsp;<a href="http://vi.wikipedia.org/w/index.php?title=Khe_C%C3%B2&amp;action=edit&amp;redlink=1" title="Khe Cò (trang chưa được viết)">Khe Cò</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/Ph%E1%BB%91_Ch%C3%A2u" title="Phố Châu">Phố Châu</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/V%C5%A9_Quang" title="Vũ Quang">Vũ Quang</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/T%C3%A2n_%E1%BA%A4p" title="Tân Ấp">Tân Ấp</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/Khe_G%C3%A1t" title="Khe Gát">Khe Gát</a>,&nbsp;<a href="http://vi.wikipedia.org/w/index.php?title=B%C3%B9ng&amp;action=edit&amp;redlink=1" title="Bùng (trang chưa được viết)">Bùng</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/Cam_L%E1%BB%99" title="Cam Lộ">Cam Lộ</a>,&nbsp;<a href="http://vi.wikipedia.org/w/index.php?title=C%E1%BA%A7u_Tu%E1%BA%A7n&amp;action=edit&amp;redlink=1" title="Cầu Tuần (trang chưa được viết)">bridge &nbsp;Tuần</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/Khe_Tre" title="Khe Tre">Khe Tre</a>,&nbsp;<a href="http://vi.wikipedia.org/w/index.php?title=%C4%90%C3%A8o_%C4%90%C3%AA_Bay&amp;action=edit&amp;redlink=1" title="Đèo Đê Bay (trang chưa được viết)">Đê Bay</a> pass, Mũi Trâu <a href="http://vi.wikipedia.org/w/index.php?title=%C4%90%C3%A8o_M%C5%A9i_Tr%C3%A2u&amp;action=edit&amp;redlink=1" title="Đèo Mũi Trâu (trang chưa được viết)">pass </a>,&nbsp;<a href="http://vi.wikipedia.org/w/index.php?title=T%C3%BAy_Loan&amp;action=edit&amp;redlink=1" title="Túy Loan (trang chưa được viết)">Túy Loan</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/H%C3%B2a_Kh%C6%B0%C6%A1ng" title="Hòa Khương">Hòa Khương</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/Th%E1%BA%A1nh_M%E1%BB%B9" title="Thạnh Mỹ">Thạnh Mỹ</a>,&nbsp;Lò Xo <a href="http://vi.wikipedia.org/w/index.php?title=%C4%90%C3%A8o_L%C3%B2_Xo&amp;action=edit&amp;redlink=1" title="Đèo Lò Xo (trang chưa được viết)">pass </a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/Ng%E1%BB%8Dc_H%E1%BB%93i,_Kon_Tum" title="Ngọc Hồi, Kon Tum">Ngọc Hồi, Kon Tum</a>, <a href="http://vi.wikipedia.org/wiki/PleiKu" title="PleiKu">PleiKu</a> city, <a href="http://vi.wikipedia.org/wiki/Bu%C3%B4n_Ma_Thu%E1%BB%99t" title="Buôn Ma Thuột">Buôn Ma Thuột</a> city,&nbsp;<a href="http://vi.wikipedia.org/wiki/Gia_Ngh%C4%A9a" title="Gia Nghĩa">Gia Nghĩa</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/Ch%C6%A1n_Th%C3%A0nh" title="Chơn Thành">Chơn Thành</a>, <a href="http://vi.wikipedia.org/wiki/B%C3%ACnh_Ph%C6%B0%E1%BB%9Bc" title="Bình Phước">Bình Phước</a> intersection,&nbsp;<a href="http://vi.wikipedia.org/wiki/%C4%90%E1%BB%A9c_Hu%E1%BB%87" title="Đức Huệ">Đức Huệ</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/Th%E1%BA%A1nh_H%C3%B3a" title="Thạnh Hóa">Thạnh Hóa</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/T%C3%A2n_Th%E1%BA%A1nh" title="Tân Thạnh">Tân Thạnh</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/M%E1%BB%B9_An" title="Mỹ An">Mỹ An</a>, <a href="http://vi.wikipedia.org/wiki/Cao_L%C3%A3nh" title="Cao Lãnh">Cao Lãnh</a>city&nbsp;,&nbsp;<a href="http://vi.wikipedia.org/w/index.php?title=C%E1%BA%A7u_Cao_l%C3%A3nh&amp;action=edit&amp;redlink=1" title="Cầu Cao lãnh (trang chưa được viết)"> Cao lãnh</a> bridge&nbsp;(<a href="http://vi.wikipedia.org/wiki/S%C3%B4ng_Ti%E1%BB%81n" title="Sông Tiền">sông Tiền</a>),&nbsp;Vàm Cống <a href="http://vi.wikipedia.org/w/index.php?title=C%E1%BA%A7u_V%C3%A0m_C%E1%BB%91ng&amp;action=edit&amp;redlink=1" title="Cầu Vàm Cống (trang chưa được viết)">bridge &nbsp;</a>&nbsp;(<a href="http://vi.wikipedia.org/wiki/S%C3%B4ng_H%E1%BA%ADu" title="Sông Hậu">sông Hậu</a>),&nbsp;<a href="http://vi.wikipedia.org/wiki/R%E1%BA%A1ch_S%E1%BB%8Fi" title="Rạch Sỏi">Rạch Sỏi</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/Minh_L%C6%B0%C6%A1ng" title="Minh Lương">Minh Lương</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/G%C3%B2_Quao" title="Gò Quao">Gò Quao</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/V%C4%A9nh_Thu%E1%BA%ADn,_Ki%C3%AAn_Giang" title="Vĩnh Thuận, Kiên Giang">Vĩnh Thuận</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/Th%C3%A0nh_ph%E1%BB%91_C%C3%A0_Mau" title="Thành phố Cà Mau"> Cà Mau</a> city,&nbsp;<a href="http://vi.wikipedia.org/wiki/C%E1%BA%A7u_%C4%90%E1%BA%A7m_C%C3%B9ng" title="Cầu Đầm Cùng"> &nbsp;Đầm Cùng</a> bridge,&nbsp;<a href="http://vi.wikipedia.org/wiki/N%C4%83m_C%C4%83n" title="Năm Căn">Năm Căn</a>,&nbsp;<a href="http://vi.wikipedia.org/wiki/%C4%90%E1%BA%A5t_M%C5%A9i" title="Đất Mũi">Đất Mũi</a>.<br  />
<strong>Capital Source :</strong> in form of &nbsp;BT, BOT, ODA and government bonds.<br  />
&nbsp;<br  />
<strong>Design Scale of Package 19 : Trại Niệm bridge construction</strong><br  />
- Bridge Type &nbsp;: pre-stressed concrete bridge<br  />
- Length &nbsp;: L=156.22m&nbsp;<br  />
- Bridge spans &nbsp;: including 5 bridge spans, each of 24.54m<br  />
- Life : 100 years;<br  />
- Design load: HL93, accounting with alone heavy means XB-80, pedestrian load: &nbsp;300KG/m2;<br  />
- Bridge Transaction : 9m (car lane: 7m, balcony 2x0.5m, safety zone: 2x0.5m);<br  />
- &nbsp;Linking road transaction: road surface 8m long + strengthened border 2x1.0=2m;<br  />
- Earthquake Load: Level 5;<br  />
<strong>Duration:&nbsp;</strong>24 months<br  />
<strong>Contract Value :</strong>&nbsp;……billion VND<br  />
<br  />
<strong>Design Scale of Package 22 : Kenh Nam bridge – Kenh Ho Bridge:</strong><br  />
- Bridge Type &nbsp;: Bridge &nbsp;pre-stressed concrete bridge;<br  />
- Length : L=156.22m<br  />
- Bridge spans &nbsp;: 6 spans 24.54m (Kenh Nam); 7 spans (Kenh Ho);<br  />
- Life : 100 years;<br  />
- Design Load : HL93, accounting with alone heavy means XB-80, pedestrian load 300KG/m2;<br  />
- Transaction bridge &nbsp;: 9m (car lane: 7m, balcony 2x0.5m, safety zone: 2x0.5m);<br  />
- Linking road transaction : road surface 8m long + strengthened border 2x1.0=2m;<br  />
- Earthquake load: Level 5;<br  />
<strong>Duration:&nbsp;</strong>24 months<br  />
<strong>Contract Value :</strong>&nbsp;……billion VND<br  />
<br  />
<strong>Design Scale of Package 41 : Kinh Nam bridge &nbsp;</strong><br  />
- Bridge Type &nbsp;: Bridge &nbsp;pre-stressed concrete bridge;<br  />
- Length : L=180.83m<br  />
- Bridge spans &nbsp;: 7 spans 24.54m<br  />
- Life : 100 years;<br  />
- Design Load : HL93, accounting with alone heavy means XB-80, pedestrian load 300KG/m2;<br  />
- Transaction bridge &nbsp;: 9m (car lane: 7m, balcony 2x0.5m, safety zone: 2x0.5m);<br  />
- Linking road transaction : road surface 8m long + strengthened border 2x1.0=2m;<br  />
- Earthquake load: Level 5;<br  />
<strong>Duration:&nbsp;</strong>24 months<br  />
<strong>Contract Value :</strong>&nbsp;……billion VND</p>]]>
			</description>
						<pubDate>Wed, 11 Jan 2017 14:01:24 GMT</pubDate>
			
		</item>
		
		<item>
			<title>Cu Chi District Water Supply Project</title>
			<link>https://ciiec.com.vn/en/project/Completed-projects/Cu-Chi-District-Water-Supply-Project-10/</link>
						<guid isPermaLink="false">
				<![CDATA[project_10]]>
			</guid>
			
			<description>
				<![CDATA[<img src="/assets/project/nuoc_cu_chi23.jpg" width="100" align="left" border="0"><p><strong>Project:</strong><br  />
Water Supply Investment and Management in Cu Chi District<br  />
<strong>Location</strong>: Cu Chi District<br  />
<strong>Investor</strong>: Saigon Water Infrastructure JTC<br  />
<strong>Stage 1: </strong>Design, supply material and equipment, start working on delivering pipe route and services connecting point (Package 5)<br  />
<strong>General information:</strong><br  />
Pipe length (uPVC D100,150,200; HDPE D63; Gang D100;150;200)of villages in Cu Chi district<br  />
- Phuoc Hiep Village&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; :&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 13,197&nbsp; Km<br  />
- Trung An Village&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; :&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 28,730&nbsp; Km<br  />
- Tan Thanh Dong Village&nbsp; :&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 99,909&nbsp; Km<br  />
- Phu Hoa Dong Village&nbsp;&nbsp;&nbsp;&nbsp; :&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 69,138&nbsp; Km<br  />
- Hoa Phu Village&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 37,426&nbsp; Km<br  />
- Tan Thanh Tay Village&nbsp;&nbsp;&nbsp; :&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 29,123&nbsp; Km<br  />
- Tan Thong Hoi Village&nbsp;&nbsp;&nbsp;&nbsp; :&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 81,428&nbsp; Km<br  />
- Tan An Hoi Village&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; :&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 41,194&nbsp; Km<br  />
<strong>Project scale Stage 1</strong>: 369.327 billion VND<br  />
<strong>Duration</strong>: will be finished on June 30<sup>th</sup>, 2016<br  />
<strong>Stage 2: Supply material and pipes, install delivering pipe route and services connecting point in Hoa Phu village (Package 22)</strong>&nbsp;, Phu Hoa Dong village (Package 16), Tan An Hoi village (Package 25), Tan Thanh Dong village (Package 26), Tan Thanh Tay (Package 23), Trung An Village (Package 24), Cu Chi town and Tan Thong Hoi village (Package 27).<br  />
<strong>General information:</strong><br  />
- Construct pipe uPVC 200 (including technology, building, remaking)<br  />
&nbsp;- Pipe HDPE OD63&nbsp; ((including technology, building, remaking)<br  />
&nbsp;- Pipe HDPE OD25 (pipe linking to service watch )<br  />
- Construct pipe uPVC 100 (including technology, building, remaking)<br  />
&nbsp;- Construct pipe uPVC 150&nbsp; (including technology, building, remaking)<br  />
&nbsp;- Construct pipe uPVC 200 (including technology, building, remaking)<br  />
&nbsp;- Pipe HDPE OD63&nbsp;(including technology, building, remaking)<br  />
&nbsp;- Pipe HDPE OD25 (pipe linking to service watch)<br  />
<strong>Location</strong>: Cu Chi District<br  />
<strong>Project Scale Stage 2</strong>: 499 048 &nbsp;billion VND<br  />
&nbsp;</p>]]>
			</description>
						<pubDate>Wed, 11 Jan 2017 14:01:36 GMT</pubDate>
			
		</item>
		
		<item>
			<title>1A National Road in Phan Rang  - Ninh Thuan expanding project</title>
			<link>https://ciiec.com.vn/en/project/Completed-projects/1A-National-Road-in-Phan-Rang-Ninh-Thuan-expanding-project-11/</link>
						<guid isPermaLink="false">
				<![CDATA[project_11]]>
			</guid>
			
			<description>
				<![CDATA[<img src="/assets/project/ql1aninhthuan.jpg" width="100" align="left" border="0"><p><strong>*&nbsp;Project</strong>:<br  />
Expanding National Road 1 Investment cross Ninh Thuan Province from Km1525+000 to Km1589+300.<br  />
<strong>* General Information:</strong><br  />
Expanding National Road 1 Investment cross Ninh Thuan Province from Km1525+000 to Km1589+300 is a part of project along with Government and Ministry of Transports undertakings of investing to construct and expand National Road 1 from Thanh Hoa to can Tho to finish 4-lane route project in 2016.<br  />
<strong>&nbsp;* Capital Source:</strong><br  />
<strong>Project in form of BOT contract, investor: CII. Total investment scale: 2,110 billion VND. Duration: 17 months.</strong><br  />
&nbsp;*&nbsp;<strong>Location </strong>:Km1525+000 to Km1589+300 National Road, Ninh Thuan province.<br  />
- Part 1: The beginning Km1525+000 in Thuan Bac, Ninh Thuan Province, the end Km1551+246 in Ninh Hai, Ninh Thuan Province, length of part design route L=26.246 km;<br  />
- Part 2: The beginning Km1563+000 in Ninh Phuoc, Ninh Thuan Province, the end Km1567+in Ninh Phuoc, Ninh Thuan Province, length of part design route L=4.500 km;<br  />
- Part 3: The beginning Km1573+350 in Thuan Nam , Ninh Thuan Province, the end Km1574+500 in Thuan Nam , Ninh Thuan Province, length of part design route L=1.150 km;<br  />
- Part 4: The beginning Km1581+950 in Thuan Nam , Ninh Thuan Province, the end Km1584+550 in Thuan Nam , Ninh Thuan Province, length of part design route L=2.600 km;<br  />
- Part 5: The beginning Km1586+000 in Thuan Nam , Ninh Thuan Province, the end Km1588+500 in Thuan Nam , Ninh Thuan Province, length of part design route L=2.500 km;<br  />
<strong>* Project scale:</strong><br  />
<strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;Roads:</strong><br  />
<strong>Level – 3 delta road, VTK = 80km/h as standard TCVN 4050-2005. However, in greatly difficult part, VTK = 60 km/h is allowed as Document no. 1086/</strong> BGTVT-KHCN on January 27<sup>th</sup>, 2014.<br  />
<strong>&nbsp;Bridges:</strong><br  />
&nbsp;&nbsp;- Brand-new bridges: permanent&nbsp; BTCT and BTCT DƯL<br  />
&nbsp; - Reused bridges: Use the current situation and exploit with existing load.<br  />
&nbsp;</p>]]>
			</description>
						<pubDate>Wed, 11 Jan 2017 14:01:59 GMT</pubDate>
			
		</item>
		
		<item>
			<title>Package 5A - Parallel Line on the right</title>
			<link>https://ciiec.com.vn/en/project/Completed-projects/Package-5A-Parallel-Line-on-the-right-14/</link>
						<guid isPermaLink="false">
				<![CDATA[project_14]]>
			</guid>
			
			<description>
				<![CDATA[<img src="/assets/project/shp-5a2.jpg" width="100" align="left" border="0">Basic Information:<br  />
Widening Ha Noi Highway was a part of project of fulfilling the increasingly heavy traffic volume, landscaping North-Eastern Gateway, HCM City. Ha Noi Highway crossing areas including Binh Thanh District, District 2,9 and Thu Duc District of HCMC and of Di An ward, Binh Duong Province.<br  />
The position based on chainage of right parallel line,<br  />
total length: L = 1.92KM<br  />
Starting point: : Km2+975.92 ( associated with chainage of main road Km6+766.90)<br  />
Ending point: Km4+894.64 ( chainage of main road Km8+700.00).<br  />
Capital for package: Project Corporation was Ha Noi Highway construction Joint Stock Company( BOT)<br  />
Demension :<br  />
Bridge type: Urban road<br  />
Design velocity: V=60Km/h (at intersection V= 40Km/h)<br  />
Design load: axle 12T<br  />
Pavement: hot blacktop with thickness of 12cm ( 5cm fine blacktop+ 7cm medium blacktop<br  />
Pavement structure: 5cm fine blacktop+ 7cm medium blacktop+45cm macadam<br  />
Sidewalk structure: self-wadded cement brick 10cm+30cm medium sand<br  />
Cross section: formation width B=18m( Pavement width:12m, right sidewalk width:5m, left land width: 1m<br  />
Located drainage on the right line<br  />
Earthworks: none ( except for replacement of soft soil by hard soil)<br  />
Located utilities trench along with lines<br  />
Workflows: 12 months<br  />
Contract Value:… billion VND]]>
			</description>
						<pubDate>Thu, 30 Mar 2017 13:03:24 GMT</pubDate>
			
		</item>
		
	</channel>
</rss>